Flashing Factors Middleburg FL

Rowlock brick sills contain many joints and are particularly susceptible to water penetration. For this reason, I do not recommend their use in freeze-thaw environments in Middleburg.

RCS Containers
904-291-7636
Post Office Box 1329
Orange Park, FL
Ed Alphonse Construction, Inc.
(904) 591-1727
PO Box 65700
Orange Park, FL
Croft Heating & Air Conditioning
904 908-6992
6119 Townsend Road
Jacksonville, FL
Safe Guard Fence Inc.
904 477 8157 or 904 880 8777
9799 Mining Dr unit # 02
Jacksonville, FL
Mr. Build, Inc.
2211 58th Ave E
Bradenton, FL
RCS Containers
904-291-7636
Post Office Box 1329
Orange Park, FL
FLGACabinetsTileAndTops.com
904-638-9073
P.O. Box 442140
Jacksonville, FL
Silcox Contracting, Inc.
904-389-1516
4582 Lexington Avenue
Jacksonville, FL
All Interior Supply (Acoustical Ceilings)
904-262-6160
9855-201 Mining Drive
Jacksonville, FL
Basic Building, Inc.
954-695-2000
7143 Nw 67Th Way
Parkland, FL
Data Provided by:
  
Provided By:

Flashing Factors

Source: MASONRY CONSTRUCTION MAGAZINE
Publication date: October 1, 2005

Should flashing be used beneath rowlock brick window sills? If through-wall flashing is installed beneath these rowlocks, how are the sills anchored? If the anchors penetrate the flashing, does this lead to deterioration of the masonry below in freeze-thaw environments?

Rowlock brick sills contain many joints and are particularly susceptible to water penetration. For this reason, I do not recommend their use in freeze-thaw environments.

When they are used in freeze-thaw environments, however, the flashing beneath them is critical to prevent water from saturating the top of the masonry wall below. Snow and ice collects on the rowlock sills. When they melt, water can penetrate the sills and refreeze, resulting in deterioration. This scenario is a particular problem with the anchorage of these sills because they break apart.

When rowlock sills are used, they can be anchored using galvanized corrugated wall ties in the head joint between every fourth to sixth brick unit. When possible, I prefer that these anchors be attached to the backup wall on the vertical face, behind the sill.

It also is possible to extend flat strap anchors through the flashing. However, any penetrations through the flashing must be carefully sealed.

Click here to read full article from Masonry Construction