Framer's Guide to Engineered Lumber Middleburg FL

Engineered lumber in Middleburg does everything solid-sawn lumber does, except better. It's stronger, lighter, straighter, and more stable. But working with I-joists and laminated veneer lumber (LVL) is different than solid-sawn lumber, so check out these tips for getting better, faster results.

The Home Depot
(904)589-9516
1575 Branan Field Road
Middleburg, FL
The Home Depot
(904)541-0114
1575 County Road 220
Orange Park, FL
The Home Depot
(904)781-6208
855 Lane Ave South
Jacksonville, FL
Lowe's
(904) 589-3022
1700 Blanding Boulevard
Middleburg, FL
Lowe's of Middlebury
904-589-3022
1700 Blanding Blvd Middlebury, FL, 32068
Middlebury, FL
The Home Depot
(904)269-3117
1919 Wells Rd
Orange Park, FL
The Home Depot
(904)771-3228
9751 Crosshill Blvd
Jacksonville, FL
Hagan Ace Hardware
(904) 282-1613
2620 Blanding Blvd
Middleburg, FL
The Home Depot
(904)589-9516
1575 Branan Field Road
Middleburg, FL
Hagan Ace Hardware
(904) 272-1414
1022 Blanding Blvd
Orange Park, FL
Provided By:

Framer's Guide to Engineered Lumber

Source: TOOLS OF THE TRADE Magazine
Publication date: March 1, 2003

By Scott Woelful

Engineered lumber does everything solid-sawn lumber does, except better. It's stronger, lighter, straighter, and more stable. But working with I-joists and laminated veneer lumber (LVL) is different than solid-sawn lumber, so check out these tips for getting better, faster results.

Beams and Rim Joists. When you hang joists off a built-up center-span LVL beam (or flush header), check the widths of the LVL components. I've seen these vary as much as 3/8 inch from one another, which is enough to throw a top-hung joist hanger out of line. When the hanger is off, it's difficult to set the joist properly. To compensate for this we assemble headers and beams and then power plane them flush to flatten the top edge, before installing hangers and joists.

OSB rim joists can vary in thickness. Moisture swells them quickly, which can affect your joist measurements and slow you down. The best strategy to avoid this is to schedule delivery of your rim joist material just in time to use it, and keep it as dry as possible until it's installed.

Storage. Manufacturers recommend storing I-joists on edge. If laid flat on uneven terrain, they can take on a wobble. Using layout marks on your floor sheathing helps you keep joists in line as you lay the sheathing.

Cutting. You don't have to, but we find it's easier to use guides for cutting I-joists.

Click here to read full article from Tools of the Trade